To solve the problem of water logging in Lamphelpat and its surrounding area, the excess water is being drained out through Shamushang Uku with the help of 12 water pumps round the clock for which a dedicated power line has been provided, IFC Minister N Biren informed the Assembly today Source The Sangai Express
Read more / Original news source: http://e-pao.net/ge.asp?heading=4&src=260811