Construction of Bailley Bridge without an approach road, retaining wall and a slab culvert, over Chakpi River at Anal Khullen has left the bridge in a poor shape even though the construction work was completed within the stipulated time Source The Sangai Express
Read more / Original news source: http://e-pao.net/ge.asp?heading=19&src=110914