Even as traffic congestion has been eased to a large extent after the NEC funded Inter State Bus Terminus ISBT at Khuman Lampak became operational, most of the blacktopped roads inside the bus terminus have begun to corrode and potholes have started adorning the roads Source The Sangai Express
Read more / Original news source: http://e-pao.net/ge.asp?heading=7&src=241017