Drawing the attention of the Works Minister into the alleged slow pace of progress in construction of suspension bridge over Barak river in between Dikiuram and Katang in Tamenglong district, the Zeliangrong Students’ Union Manipur ZSUM has threatened to launch total bandh or economic blockade along the Imphal Jiribam road if the authority concerned fails to address their plights Source The Sangai Express
Read more / Original news source: http://e-pao.net/ge.asp?heading=13&src=090512