While maintaining that work on NH 37 Imphal Jiribam highway was impeded by rainfall and continuous movement of heavy vehicles, BRO Director General Lt Gen S Ravi Shankar has assured that the highway development work would be fully completed by December 2013 Source The Sangai Express
Read more / Original news source: http://e-pao.net/ge.asp?heading=1&src=101112